Why months pass between order and shelf
Short answer: The yarn is spun, the fabric is knitted and dyed, the garments are sewn and the goods are shipped. Each step takes weeks and cannot run at the same time. That is why months often pass from an order to the item on our shelf.
Yarn and fabric come first
The fabric must be fully finished before anyone can cut it at all. Yarn is spun in batches, and only once enough yarn is ready can the knitting machines be set up. See bamboo clothing for women for a sense of the fabric behind each style.
Dyeing needs a whole batch
Dyeing happens in large batches so the color stays even from piece to piece. A small batch is not dyed faster, it just becomes more expensive per meter and harder to match later. See bamboo t-shirt for women for fabric in several color options.
Sewing takes time per piece
Every garment is sewn individually by a seamstress. The number of pieces decides how long sewing takes, no matter how many machines are standing ready. See bamboo underwear for women for items with more seams and detail than a simple top.
Shipping is the last link
Sea freight takes weeks and covers most of the range. Air freight is faster but costs more, and is only used when a gap on our shelf makes it necessary. See bamboo socks for women for an item that usually travels by ship.
Season puts pressure on the schedule
Ahead of a season, many stores order at once, and factories only have a set number of machines and hands. That pushes lead time out further right when demand is highest, and planning matters more than speed.
Popular items wait in the same line
A bestseller does not skip ahead just because it sells well. Yarn, fabric and dyeing follow the same order for every item, and a reorder starts from scratch like any other order.
Planning starts months in advance
Because every step takes time, orders are placed months before an item is needed. If demand shifts, an item can stay sold out for weeks even though a new order is already on its way.
Why it cannot move faster
Each step can be tightened a little, but the order cannot change. Fabric must be finished before it is dyed, and dyed fabric before it is sewn. That sets a floor for how fast an order becomes an item on the shelf.
What this means for you as a customer
If an item is briefly sold out, it is often on the way, just weeks from arriving. It can pay to keep an eye on an item rather than expect it back the same week.
Frequently asked questions
Frequently asked questions
Why does reordering take so long?
Because yarn, fabric, dyeing, sewing and shipping are separate steps that cannot run at the same time. Each one adds weeks before the item reaches the shelf.
Why not just produce less and faster?
Because dyeing happens in large batches. A small batch becomes more expensive per piece and is not necessarily faster to have ready for delivery.
What takes the longest in the process?
Often fabric and dyeing, because they must be fully finished before sewing of the individual garments can even begin.